Construction estimating services

Send your plans. Get a complete estimate.

Upload your PDF plans and receive the DUPA, Bill of Quantities and Gantt chart for your project in 3–5 working days – prepared by a licensed architect.

Prepared by Archt. Dan S. Barcelina, uap · developer of PrimeCost PRO
₱120/sqmComplete package, all trades
3–5 daysStandard turnaround
PDF + ExcelDUPA, BOQ, Gantt chart
1 free revisionWithin 7 days of delivery

What we estimate

Choose the complete package or only the trades you need. Rates are per square meter of total floor area.

Best value

Complete package – all trades

₱120 / sqm
Minimum ₱10,000
  • Structural, architectural, electrical, plumbing & sanitary and roofing
  • Full Program of Work with DUPA for every item
  • Bill of Quantities and construction Gantt chart
Request this package
Save ₱15/sqm versus ordering every trade separately.

Structural

₱40 / sqm
Minimum ₱3,500
  • Concrete: footings, columns, beams, slabs
  • Reinforcing steel and formworks
  • Structural steel

Architectural

₱40 / sqm
Minimum ₱3,500
  • Masonry, plastering, finishes, painting
  • Doors, windows, ceilings
  • Tiles and floor finishes

Electrical

₱20 / sqm
Minimum ₱2,500
  • Wires, conduits, boxes
  • Panel boards and breakers
  • Lighting and outlets

Plumbing & sanitary

₱20 / sqm
Minimum ₱2,500
  • Water supply lines
  • Sanitary and drainage lines
  • Fixtures and septic tank

Roofing

₱15 / sqm
Minimum ₱2,000
  • Roof framing (steel or wood)
  • Roofing sheets, gutters, flashing
  • Insulation and accessories

Rush & special projects

+30%
Rush: 2 working days
  • Commercial, industrial and infrastructure projects – quoted per project
  • Other construction estimates on request

Estimate your fee

Enter your total floor area and pick the services. The final price is confirmed after we review your plans.

Estimated fee
₱14,400
Final price confirmed after plan review. Payment by GCash, bank transfer or PayPal.

What you receive

Every estimate comes as ready-to-use files you can print, submit or edit.

DUPA sample
PDF

DUPA

Detailed Unit Price Analysis per item: labor, equipment, materials, OCM, profit and VAT.

Bill of Quantities sample
PDF

Bill of Quantities

Quantities, unit costs and amounts for every work item, with totals per trade.

#
Description
Qty
Amount
1
Concrete works
42.5
318,750
2
Rebar (Gr. 40)
3,860
212,300
3
Formworks
215
96,750
4
CHB 4" wall
380
167,200
5
Roofing
130
110,500
6
Electrical
1
98,400
EXCEL

BOQ in Excel

The same Bill of Quantities as an editable spreadsheet for your own pricing and bids.

Gantt chart sample
PDF

Gantt chart

Construction schedule with durations, links between activities and the critical path.

Sample images. The Excel figures are an illustration only.

How it works

From plans to finished estimate in five steps.

Upload your plans

Send your PDF plans and project details using the form below.

Get your quote

We review the plans and email your price and delivery date within 1 working day.

Confirm & pay 50%

Pay the down payment by GCash, bank transfer or PayPal to start.

Receive your files

DUPA, BOQ (PDF + Excel) and Gantt chart in 3–5 working days.

Pay the balance

Includes one free revision within 7 days of delivery.

Request a quote

Upload your plans and we'll reply with your price and delivery date within 1 working day.

Click to choose PDF files or drag them here
Up to 25 MB in total
Thank you! We received your plans and will email your quote within 1 working day.

Questions

What plans do you need?

Architectural floor plans and elevations at minimum. For structural, electrical and plumbing estimates please include those plans too. Clear, scaled PDFs give the most accurate quantities.

Which prices do you use?

Current material and labor prices for your project location. If you have your own supplier quotes, send them in the notes and we'll use them.

Are my plans kept confidential?

Yes. Your plans are used only to prepare your estimate and are never shared.

How is the floor area measured?

Total floor area of all levels, as shown on your plans. If you're unsure, leave it blank – we'll compute it and include it in your quote.

Can I request changes?

Yes – one free revision within 7 days of delivery (for example, changing a material or quantity). Design changes to the plans are quoted separately.

Do you estimate commercial and industrial projects?

Yes. Commercial, industrial and infrastructure projects are quoted per project after we review the plans.

Can I do my own estimates instead?

Yes – the same tools we use are available as PrimeCost PRO, with a free 7-day trial.